• Grupotagar
  • Services
  • Portfolio
  • Quotes
  • Downloads
  • Contacts
Portfolio
  • LR 1600/2W - Last acquisition of Grupotagar
  • LTM 11200 9.1 - Assembly of Wind Farm in Algarve- Portugal
  • LTM 11200 9.1 - Change of crane between platforms in Wind Farm
  • LTM 11200 9.1 + LTM 1500 8.1 + LTM 1400 7.1 - Assembly of port crane
  • LTM 11200 9.1 + LTM 1500 8.1 + LTM 1400 7.1 - Lifting crane port with 360 tonnes - 1
  • LTM 11200 9.1 + LTM 1500 8.1 + LTM 1400 7.1 - Lifting crane port with 360 tonnes - 2
  • LTM 11200 9.1 + LTM 1500 8.1 + LTM 1400 7.1 - Lifting crane port with 360 tonnes - 3
  • LTM 1100 4.1 + LTM 1070 4.2 + LTM 1055 3.2 - Final assessments in the assembly of crane port
  • LTM 11200 9.1 - Assembly of Wind Farm in Madeira - Portugal - 1
  • LTM 11200 9.1 - Assembly of Wind Farm in Madeira - Portugal -2
  • LTM 1500 8.1 - Assembly of a complete crane inside a factory in Trofa
  • LTM 1500 8.1 - Assembly of a unit of air conditioning at 108 meters radius
  • Fleet Land
  • Transport of eolic blades with 42 meters of length
  • Grupotagar on the road for one more day of work
  • LTM 11200 9.1 - Assembly of Wind farm in Vila Pouca de Aguiar- Portugal
  • LTM 11200 9.1 + LTM 1250 6.1 - Assembly of blades in Vila Pouca de Aguiar-Portugal
  • Assembly of pre-manufactured
  • Assembly of pre-manufactured panels
  • LTM 1500 8.1 + LTM 1070 4.1 - Replacement of Gearbox in Pampilhosa da Serra
  • LTF 1045 4.1 - 45 Tons of capacity and 45 meters of launches
  • LTM 1400 7.1 - Shipment of crane to Cabo Verde
  • LTM 1400 7.1 + LTM 1130 5.1 + LTM 1070 4.1 - Assembly of wind farm in Cabo Verde
  • 3 Cranes LTM 1500 8.1 + LTM 1250 6.1 - Assembly of metal structure with 340 tons and approximately 50 meters of length
  • LTM 11200 9.1 - Assembly of various metallic structures in Coimbra-1
  • LTM 11200 9.1 - Assembly of various metallic structures in Coimbra-2
  • LTM 11200 9.1 - Assembly of metal structures with 180 tonnes of weight
  • LTM 1500 8.1 - Repair of the internal part of a flair in the Refinery
  • LTM 1250 6.1 + LTM 1200 5.1 - Assembly of pre manufactured beams with 100 tonnes in Grandola
  • LTM 1500 8.1 + LTM 1070 4.1 - Assembly of Wind Tower in Penamacor-Sabugal
  • LTM 1400 7.1 - Assembly of prefabricated beams in Avintes
  • LTM 11200 9.1 - Expansion of Petrogal in the Refinery of Matosinhos in photography to raise 160 tons
  • LTM 1400 7.1 + LTM 1200 7.1 - Assembly of viaducts on the Island of the Açores -1
  • LTM 1400 7.1 + LTM 1200 7.1 - Assembly of viaducts on the Island of the Açores -2
  • LTM 11200 9.1 + LTM 1500 8.1 - Dismantling of factory -1
  • LTM 11200 9.1 + LTM 1500 8.1 - Dismantling of factory -2
  • LTM 11200 9.1 + LTM 1500 8.1 - Dismantling of factory -3
  • LTM 11200 9.1 + LTM 1500 8.1 - Dismantling of factory -4
  • LTM 11200 9.1 + Dismantling of factory
  • LTM 1040 2.1 - Assembly of pre-manufactured
  • LTM 11200 9.1 + LTM 1250 6.1 - Repair of nacelle in the Wind farm on Tarragona-Spain
Copyright © 2012 Grupotagar - All rights reserved